Articles

Measure procurement through total costs

A low unit price can be offset by transport, payment terms or quality effort. A comparison needs a consistent cost basis.

Put quotations on the same basis

Compare specifications, volumes, delivery terms and payment periods. Show product prices, tooling, transport, duties and agreed inspection costs separately. Keep unknown items visible instead of silently treating them as zero.

Distinguish cost from capital tied up

Total procurement cost and the duration of capital tied up are separate measures. Record payment timing, transit time and inventory. Shorter capital tie-up improves access to funds; it does not automatically create an equivalent cash saving.

Decision guide

A sound basis for comparing quotations

Begin with the same specification and volume assumptions. Keep unknown cost items visible instead of treating them as zero.

Product and tooling
Compare specification revision, material, annual volume, minimum lot size, tooling cost and ownership.
Quality and evidence
Include inspection scope, sampling, required evidence and the response to non-conformities in the quotation.
Transport and import
Compare delivery terms, packaging, route, insurance and applicable import costs on the same basis.
Capital and inventory
Show payment milestones, transit time, safety stock and financing separately from the unit price.

Award decisions should consider technical equivalence, total costs and supply continuity together. A lower unit price alone does not demonstrate savings.

Two separate client projects

Large building materials manufacturer · Asian procurement

In this project, total procurement costs were sustainably reduced by 13%, and the average duration of capital tied up was reduced by 23 days. The cost comparison covers total procurement costs on an annual basis.

View the case study ↗

Automotive supplier · Welded assemblies for a German vehicle manufacturer

Total procurement costs in this project were reduced by 27% while maintaining the required quality standards. The cost comparison covers total procurement costs on an annual basis.

View the case study ↗

These statements concern individual anonymised projects. Results are project-specific and are not a promise for future assignments.

← All articlesRelated service ↗

Discuss this topic

Discuss this topic ↗